Highway Closure Update, 3/29/17

Photos from Top to bottom: 1) Aerial of Paul’s Slide (PM 21.6); 2) Beautiful flowers and coastal view—courtesy of Hermitage (PM 22.12); 3) Continues debris removal of old Pfeiffer Canyon Bridge (PM 45.52)

*Same information as last Monday* – which was the same information as last Friday, so not repeating it, yet again. Will add photos.

IMG_2329

One can see the road to the Hermitage above the slide removal work in this photo.

IMG_2330

From the Hermitage Road, above the slide area.

IMG_2332

Debris clean up – a big job.

Kyle Evans created a compilation video of the demolition of this bridge which can be found here:

https://m.youtube.com/watch?v=7uKrimYMwHA

 

~ by bigsurkate on March 29, 2017.

3 Responses to “Highway Closure Update, 3/29/17”

  1. Kyle’s video is AWESOME! Great images and perfect musical accompaniment.

    Like

  2. Obviously necessary — but very sad to see it go…

    Like

  3. Kate,

    Power outages in CVV all night long..at least 5 in total – last one lasting over 70 minutes..Called PG&E 4x, answering machine stated there was no outages in your area- which was total nonsense….

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
%d bloggers like this: